LNG Station Manufacturer for Integrated LNG Storage, Refueling and Gas Supply

 

LNG Station is an integrated equipment solution for liquefied natural gas receiving, cryogenic storage, transfer, vehicle refueling, vaporization and gas supply. Qingdao Lenado Intelligent Equipment Co., Ltd. provides LNG filling stations, storage and regasification systems, LNG dispensing skids, L-CNG conversion equipment and mobile fueling units. Its solutions serve LNG station investors, EPC contractors, gas distributors, industrial gas users and commercial fleet operators.


From individual cryogenic pumping skids to coordinated station equipment packages, Lenado supports equipment selection, system integration and project-specific configuration for different LNG supply and utilization requirements.

 

 
  • LNG Peak-shaving Station​
    The LNG Peak-shaving Station is designed to store liquefied natural gas and supply additional natural gas to urban and regional pipeline networks during periods of high demand. By storing LNG when consumption is low and regasifying it...
    view more
  • LNG Bunkering Station
    The LNG Bunkering Station is a land-based LNG storage and supply facility designed to receive LNG from tanker trucks, store it under cryogenic conditions and deliver it to LNG-powered vehicles or compatible receiving systems. It...
    view more
  • LNG Dispenser Skid
    The LNG Dispenser Skid is an integrated LNG vehicle refueling system designed for commercial stations supplied by LNG tanker trucks. It combines an LNG dispenser, cryogenic pump, unloading vaporizer, tank vaporizer, process piping and...
    view more
  • LNG Single-pump Skid
    The LNG Single-pump Skid is a pre-assembled LNG vehicle refueling unit designed for fueling stations, industrial sites and remote locations. It integrates the main LNG dispensing equipment on a common steel base, providing a compact...
    view more
  • LNG Vaporization And Pressure Reduction Skid
    The LNG Vaporization and Pressure Reduction Skid is an integrated gas supply system designed to convert liquefied natural gas into gaseous natural gas, regulate outlet pressure and deliver gas to downstream distribution networks. With...
    view more
  • Skid-mounted LNG Vehicle Refueling Station
    The Skid-mounted LNG Vehicle Refueling Station is an integrated equipment solution for LNG vehicle refueling projects. It combines LNG unloading, storage tank pressurization, cryogenic transfer and vehicle dispensing processes within a...
    view more
  • L-CNG Filling Skid
    The L-CNG Filling Skid is a skid-mounted LNG-to-CNG conversion unit designed for vehicle refueling projects using liquefied natural gas as the feedstock. It integrates LNG pressurization, high-pressure vaporization and CNG distribution...
    view more
  • LNG Filling Station
    The LNG Filling Station is an integrated vehicle refueling solution designed for public LNG stations, bus depots and logistics fleet facilities. Built around a dual-pump skid-mounted unit, it connects LNG storage, cryogenic pumping,...
    view more
  • Mobile LNG Fueling Station
    Our Mobile LNG Fueling Station brings LNG vehicle refueling closer to mining operations, construction projects, and remote industrial sites where access to fixed fueling infrastructure may be limited. The skid-mounted system is...
    view more
  • LNG Truck Fueling Station
    The LNG Truck Fueling Station is an integrated skid-mounted refueling system designed for heavy-duty LNG trucks and commercial fleet operations. It combines cryogenic pumping, dual-nozzle dispensing, vaporization and automated control...
    view more
  • LNG Refuelling Station
    Our LNG Refuelling Station is an integrated skid-mounted dispensing system designed for commercial LNG vehicle refuelling projects. It combines cryogenic pumping, dispensing equipment and control systems to supply LNG for buses,...
    view more
  • LNG Compressor Station
    The LNG Compressor Station is a skid-mounted LNG pumping and pressurization unit designed for LNG refueling stations, satellite stations and industrial gas supply facilities. It integrates submerged cryogenic pumps, heating and...
    view more
 
LNG Station Product Portfolio
 

Lenado's LNG equipment portfolio covers six main application categories, differentiated by their process functions and equipment arrangements.

LNG Storage and Gas Supply Systems

• LNG Peak-shaving Station
Designed to supplement pipeline gas supply during periods of increased demand. The system connects LNG tanker unloading, cryogenic storage, vaporization and pressure regulation to downstream gas distribution networks. Storage volume and regasification capacity are selected according to peak demand and required gas delivery conditions.
• LNG Vaporization and Pressure Reduction Skid
Converts stored LNG into natural gas and regulates outlet pressure for industrial and commercial consumption. The skid integrates vaporization and pressure regulation equipment, while the LNG storage tank can be installed separately. Selection focuses on gas output, inlet conditions, outlet pressure and downstream consumption requirements.

 

LNG Vehicle Refueling Systems

• LNG Filling Station
An integrated vehicle fueling arrangement connecting LNG storage, unloading, cryogenic pumping, vaporization, dispensing and control systems. The core pumping equipment can use TYL dual-pump configurations to support commercial vehicle refueling, bus depots and logistics fleet operations.
• Skid-mounted LNG Vehicle Refueling Station
Integrates the main pumping and refueling components on a common skid, including cryogenic pumps, vaporizers, process piping, valves and control equipment. Factory-integrated assembly reduces the number of individual equipment connections required during site installation. Storage tanks and supporting facilities can be arranged separately according to the project supply scope.

LNG Pumping and Dispensing Skids

• LNG Single-pump Skid
A single-pump cryogenic transfer and dispensing unit for stations requiring a compact pumping configuration. Published TYL-D models provide a daily LNG capacity of 20 T/D and a maximum liquid flow rate of 340 L/min.
• LNG Dispenser Skid
The TY-LNG system integrates a 60 m³ storage tank with cryogenic pumping, unloading, tank pressure regulation, dispensing and PLC control functions. Its operating arrangement supports LNG tanker unloading and vehicle refueling through coordinated process systems, including simultaneous operation under the specified configuration.

L-CNG Conversion and Filling Equipment

L-CNG Filling Skid
Uses LNG as the feed medium to produce high-pressure natural gas for CNG vehicle refueling. A plunger pump pressurizes LNG before it enters the high-pressure vaporizer. The integrated system combines pumping, vaporization, heating and sequence control.
Single-pump and dual-pump configurations are available, with published vaporizer capacities of 1,000, 1,500 and 2,500 Nm³/h per pump configuration.

 

 

 

Mobile LNG Fueling Equipment

Mobile LNG Fueling Station
Provides a transportable LNG refueling arrangement for temporary, remote and multi-site operations. Available installation arrangements include 20-foot container integration, flatbed trailer mounting and skid-mounted transportation.
The published TYL-2×15 and TYL-2×22 configurations use dual cryogenic pumps, PLC and VFD control, and two dispensing nozzles. Typical applications include mining operations, construction sites, remote logistics facilities and dedicated fleet depots.

 

LNG Bunkering and Transfer Equipment

LNG Bunkering Station
A land-based LNG storage and transfer facility designed to receive LNG from tanker trucks, store it under cryogenic conditions and supply compatible receiving vehicles or equipment. The system can include storage tanks, unloading equipment, cryogenic pumps, pressure-building vaporizers, dispensing equipment and control systems.
For port and marine fuel supply projects, the land-based station configuration must be coordinated with the receiving vessel, transfer connections, vapor return arrangements and applicable marine safety requirements.

 

LNG Station Technical Specifications

 

The following published parameters cover selected Lenado equipment models. They represent individual equipment configurations rather than universal specifications for complete LNG stations.

 

LNG Dispenser Skid – TY-LNG

Parameter

Specification

Model

TY-LNG

Storage Capacity

60 m³

Daily Dispensing Capacity

10,000–150,000 kg

Energy Consumption

≤0.05 kW/kg

Unloading Time

≤2 hours

LNG Utilization Rate in Tank

≥92%

Total Power

22 kW

Installation Type

Skid-mounted

Overall Dimensions

4.2 × 2.3 × 2.5 m

 

LNG Single-pump Skid

Parameter

TYL-D-A-1×11

TYL-D-C-1×15

TYL-D-X-1×11

Pump Configuration

Single

Single

Single

Daily LNG Capacity

20 T/D

20 T/D

20 T/D

Maximum Flow Rate

340 L/min

340 L/min

340 L/min

Temperature-increasing Vaporizer

300 Nm³/h

300 Nm³/h

300 Nm³/h

EAG Vaporizer

150 Nm³/h

150 Nm³/h

150 Nm³/h

Pump Motor Power

11 kW

15 kW

11 kW

Published skid dimensions: Approximately 3,200 × 2,300 × 2,500 mm.
Control system: PLC + VFD.

 

Mobile LNG Fueling Station – Dual-pump Models

Parameter

TYL-2×15

TYL-2×22

Rated Dispensing Capacity

40 m³/h

42 m³/h

Maximum Flow Rate

340 L/min × 2

350 L/min × 2

Cryogenic Pump Power

15 kW × 2

22 kW × 2

Total Installed Pump Power

Approx. 30 kW

Approx. 44 kW

Temperature-increasing Vaporizer

300 Nm³/h

300 Nm³/h

EAG Vaporizer

150 Nm³/h

150 Nm³/h

Control System

PLC + VFD

PLC + VFD

Dispensing Nozzles

2

2

Installation

Outdoor / Mobile-ready

Outdoor / Mobile-ready

Skid Dimensions

3,200 × 2,400 × 2,600 mm

3,200 × 2,400 × 2,600 mm

Container Compatibility

20-foot

20-foot

 

L-CNG Filling Skid

Parameter

TYL-CNG-1

TYL-CNG-2

Pump Configuration

Single Pump

Dual Pump

LNG Flow Rate

1,000 / 1,500 / 2,500 L/h

1,000 × 2 / 1,500 × 2 / 2,500 × 2 L/h

High-pressure Vaporizer

1,000 / 1,500 / 2,500 Nm³/h

1,000 × 2 / 1,500 × 2 / 2,500 × 2 Nm³/h

Motor Power

15 / 22 / 37 kW

15 × 2 / 22 × 2 / 37 × 2 kW

Dimensions

3,200 × 2,200 × 2,200 mm

3,600 × 2,200 × 2,200 mm

Control System

PLC + Touchscreen + Soft Starter

PLC + Touchscreen + Soft Starter

 

Technical Specification Notes
• Daily LNG capacity, liquid flow rate, rated dispensing capacity and vaporizer gas output are different performance indicators.
• Dual-pump equipment can be arranged for simultaneous operation or one-pump duty with one-pump standby, depending on the selected control configuration.
• Storage capacity and equipment dimensions refer to the specified models and should not be interpreted as standard dimensions for every complete station.
• Complete station capacity, storage volume, pump quantities and equipment scope are determined by the project design.

 

LNG Process Configuration and System Integration
 

LNG station performance depends on the coordination of cryogenic storage, liquid transfer, pressure regulation, vaporization and downstream supply. The main process stages include:


LNG Receiving and Unloading
LNG is delivered by tanker truck or container tank truck and transferred into the station storage tank through tanker self-pressurization, cryogenic pump transfer or a combined unloading method, depending on the equipment arrangement.
The TY-LNG dispenser skid supports these three unloading arrangements. A closed-loop gas return process can also return storage tank gas to the tanker during unloading, reducing routine venting and LNG loss.


Cryogenic Storage and Pressure Management
Vacuum-insulated storage tanks maintain LNG under cryogenic conditions. Liquid-level and pressure monitoring provide operating information for storage management.
Tank pressure-building vaporizers convert a portion of LNG into gas and return it to the tank to raise internal pressure. Their arrangement depends on storage conditions and operating requirements.

LNG Dispenser Skid

 

LNG Filling Station

LNG Pumping and Vehicle Dispensing
Submerged cryogenic pumps transfer LNG from the storage tank to the dispensing system. Pump quantity and operating mode are selected according to required throughput and simultaneous fueling demand.
The TY-LNG system uses vacuum-insulated process piping and vacuum flanges at critical connections to reduce heat ingress. Its integrated PLC control coordinates operating sequences and associated pneumatically actuated shut-off valves.


LNG Vaporization and Gas Supply
For regasification applications, ambient or other specified vaporizers convert LNG into natural gas for downstream consumption. Pressure regulation equipment controls outlet conditions.
For L-CNG applications, plunger pumps first increase LNG pressure before the high-pressure vaporizer converts the liquid into high-pressure natural gas for CNG dispensing.


BOG and Auxiliary Gas Handling
Boil-off gas (BOG) management is an important consideration in cryogenic storage and transfer systems. Storage pressure-building, gas return and associated vent or recovery arrangements are coordinated according to the selected station process.
EAG vaporizers and temperature-regulating equipment are incorporated where required by the equipment configuration.

 

LNG Engineering and Equipment Selection

 

LNG station configuration requires coordination between process requirements, equipment interfaces, site conditions and downstream connections. Key selection factors include:

 

Selection Factor

Engineering Considerations

LNG Storage

Tank volume, insulation structure, storage pressure and replenishment frequency

Unloading System

Tanker connection, unloading method and unloading capacity

Cryogenic Pumping

Pump quantity, flow rate, discharge pressure and duty arrangement

Vaporization

Required gas output, outlet pressure and vaporizer type

BOG Management

Tank pressure control, gas return and applicable recovery arrangements

Piping and Valves

Cryogenic material suitability, insulation structure and process connections

Automation

PLC functions, VFD control, monitoring and configured safety interlocks

Site Conditions

Equipment footprint, transportation access, utilities and installation layout

Safety and Compliance

Hazardous-area classification, emergency shutdown and destination-market requirements

 

Equipment Integration and Delivery Scope
Lenado coordinates the main equipment and system interfaces according to the agreed project configuration.
• Process Coordination: LNG receiving, storage, unloading, pumping, vaporization and dispensing arrangements.
• Cryogenic Component Selection: Pumps, valves, pipelines and instruments selected for specified low-temperature and pressure conditions.
• Skid Fabrication and Integration: Equipment positioning, skid dimensions, process piping, lifting arrangements and maintenance access.
• Electrical and Control Integration: PLC, VFD, instrumentation and control interfaces according to the selected system functions.
• Project Interface Coordination: Connections to storage tanks, tanker unloading points, utilities, downstream equipment and site facilities.
The supply scope can cover individual equipment skids or coordinated station packages. Storage tanks, civil works, external pipelines and other site infrastructure are included only when specified in the agreed project scope. 

 

LNG Equipment Manufacturing and Quality Control

 

Manufacturing Capabilities
Qingdao Lenado Intelligent Equipment Co., Ltd. integrates equipment R&D, production, processing and sales. Its manufacturing resources include a professional technical team, CNC production and processing equipment, equipment assembly facilities and a quality management system.
For LNG station equipment, manufacturing and integration involve skid structures, cryogenic piping arrangements, pump and vaporizer installation, valve connections, instrumentation and electrical control components. Production is organized according to the selected equipment configuration, technical drawings, component specifications and project requirements.


LNG Equipment Manufacturing Process
• Engineering and Drawing Review
Review equipment specifications, process arrangements, skid dimensions, component lists, piping connections and electrical requirements before production to coordinate equipment interfaces.
• Material and Component Preparation
Check incoming materials and purchased components against approved specifications and procurement documentation, with particular attention to cryogenic materials, pressure-bearing parts, valves, pumps and electrical instruments.
• Skid Structure Fabrication
Process and assemble the equipment base frame according to approved dimensions and structural drawings. Fabrication checks cover component positioning, structural dimensions, welding requirements and surface treatment.
• Equipment and Piping Assembly
Install cryogenic pumps, valves, process pipelines, vaporizers and associated components according to the equipment layout. Vacuum-insulated piping and connections receive particular attention because of their role in limiting heat ingress during LNG transfer.
• Electrical and Instrumentation Integration
Install control cabinets, instruments, sensors, wiring and associated electrical components. Check equipment identification, wiring connections, instrument installation and PLC interfaces.
• Testing, Inspection and Packing
Carry out applicable pressure and leakage tests, electrical checks and control-function verification according to equipment design and contractual acceptance criteria. Before dispatch, review equipment configuration, external condition, identification, supplied accessories, lifting arrangements and transportation protection.


Quality Control and Inspection Scope
Quality control for LNG equipment addresses material conformity, mechanical integrity, assembly accuracy and operating requirements.

Inspection Area

Quality Control Focus

Material Inspection

Material specifications, dimensions and relevant documentation

Welding and Fabrication

Fabrication accuracy, weld appearance and applicable welding records

Pressure-bearing Components

Design specifications, component documentation and applicable inspection requirements

Cryogenic Piping

Pipe connections, valve installation, insulation structure and assembly accuracy

Pump and Vaporizer Assembly

Model identification, installation, connections and functional condition

Pressure and Leakage Testing

Applicable pressure tests and leakage checks according to equipment design

Electrical Inspection

Wiring, grounding, instrumentation and component installation

PLC and Control Testing

Pump operation, monitoring signals, alarms and configured interlocks

Final Inspection

Equipment configuration, accessories, identification and external condition

Packing Inspection

Equipment protection, lifting points, loose accessories and transportation fixing

For pressure-bearing equipment, welding inspection, nondestructive examination and third-party inspection are arranged according to applicable design, regulations and project specifications. Factory Acceptance Testing (FAT) can be incorporated into the contractual inspection plan where required.
Inspection records and acceptance documents correspond to the actual tests and checks performed on the supplied equipment.


LNG-specific Quality and Safety Considerations
LNG equipment operates under cryogenic conditions, making low-temperature compatibility and system protection particularly important. Key considerations include:
• Low-temperature Material Suitability: Materials must be suitable for specified LNG operating temperatures.
• Cryogenic Insulation: Insulation structures and connections must limit heat ingress during LNG storage and transfer.
• Pump and Valve Compatibility: Components must suit the specified LNG medium, operating pressure and flow conditions.
• Control and Protection: Monitoring, abnormal-condition alarms, emergency shutdown and configured interlocking functions must match the selected equipment design.
These requirements are addressed according to the equipment design and applicable project standards. 

 

 
 
Technical Support and Project Delivery

Lenado provides technical assistance throughout equipment selection, manufacturing coordination, installation and subsequent operation. 

Engineering and Pre-sales Support

• Technical consultation and preliminary equipment selection.
• Review of LNG demand, storage requirements and operating conditions.
• Pump, vaporizer and equipment configuration recommendations.
• Preliminary layout and process interface discussions.
• Project-specific quotation and equipment scope definition.

Manufacturing and Delivery Coordination

• Production tracking and manufacturing progress coordination.
• Technical documentation and equipment specification preparation.
• Equipment configuration and supply scope review.
• Packaging and transportation coordination.
• Customs documentation support for international shipments.

Installation and Commissioning

• Equipment installation instructions and technical documentation.
• Guidance on equipment positioning, piping and electrical connections.
• Commissioning assistance for cryogenic pumps, vaporizers and control systems.
• On-site commissioning according to project arrangements.
• Support for operating checks and commissioning acceptance.

Operator Training and Technical Assistance

• Equipment operating procedures and system function explanations.
• Training on cryogenic pumps, vaporizers and PLC control interfaces.
• Guidance on routine inspection and maintenance.
• Remote technical assistance and fault diagnosis.
• Spare parts identification and replacement support.

 

Warranty and Long-term Maintenance

Service Item

Service Description

Warranty Period

12 months

Warranty Coverage

Manufacturing defects within the agreed warranty scope

Technical Assistance

Remote consultation and fault diagnosis

Maintenance Support

Lifelong maintenance assistance

Spare Parts

Replacement part identification and supply support

On-site Service

Available according to project arrangements

Lenado provides lifelong maintenance support, operator training and ongoing technical assistance beyond the initial warranty period, subject to the agreed service scope.

 

 

Company Credentials and Manufacturing Qualifications

Qingdao Lenado Intelligent Equipment Co., Ltd. integrates R&D, engineering design, equipment manufacturing, sales and after-sales service.
The company's published credentials include:
• ISO 9001 quality management system certification.
• Special equipment manufacturing license.
• Product explosion-proof qualifications.
• 21 product patents.
• More than 80 technologies with independent intellectual property rights.
These company-level qualifications and technical achievements support supplier evaluation and manufacturing capability assessment.
For projects involving hazardous areas or regulated pressure equipment, applicable product certificates, equipment approvals and inspection documents are determined according to the selected models, certification scope and destination-market requirements.

LNG Refuelling Station

 

 

FAQ

 

 

Q: What is the role of an EAG vaporizer in an LNG station?

A: An EAG vaporizer is an auxiliary gas-vaporization component used in specific LNG equipment configurations. Its capacity and connection arrangement should be selected according to the station's process design and the intended gas-handling function.

Q: What information is required to obtain an LNG station equipment quotation?

A: An LNG station equipment quotation typically requires information about the intended application, LNG supply method, required storage capacity, daily or peak gas demand, dispensing or gas output requirements, site conditions and destination-country standards. Available project drawings and preferred equipment arrangements can also help define the supply scope and configuration.

We are one of the most experienced LNG stations manufacturers in China, also support customized service. Please feel free to wholesale advanced LNG stations made in China here from our factory. Quality products and reasonable price are available.

Send Inquiry
Send Inquiry