The LNG Truck Fueling Station is an integrated skid-mounted refueling system designed for heavy-duty LNG trucks and commercial fleet operations. It combines cryogenic pumping, dual-nozzle dispensing, vaporization and automated control in an outdoor installation unit. It is suitable for commercial LNG stations, logistics hubs and dedicated fleet depots serving heavy-duty transportation.
Technical Specifications
The station is available in two dual-pump configurations to accommodate different LNG truck refueling capacity requirements.
|
Model |
Rated Capacity |
Maximum Flow Rate |
Pump Configuration |
|
TYL-2×15 |
40 m³/h |
340 L/min × 2 |
Dual cryogenic pumps |
|
TYL-2×22 |
42 m³/h |
350 L/min × 2 |
Dual cryogenic pumps |
Supporting Equipment Specifications
|
Component |
Specification |
|
Temperature-Rise Vaporizer |
300 Nm³/h |
|
EAG Vaporizer |
150 Nm³/h |
|
Dispensing System |
Dual LNG dispensing nozzles |
|
Control System |
PLC and VFD |
|
Installation Structure |
Integrated outdoor skid |
Key Features
Dual-Pump and Dual-Nozzle Dispensing
Two independent LNG cryogenic submerged pumps supply two dispensing points, allowing the station to serve two trucks simultaneously under suitable operating conditions. This arrangement helps fleet operators manage concentrated refueling demand and provides greater flexibility for commercial station operations.
Multi-Stage Cryogenic Pumping
The station uses multi-stage centrifugal cryogenic submerged pumps to transfer LNG from the storage system to the dispensing points. The dual-pump arrangement provides the liquid transfer capacity required for commercial heavy-duty vehicle refueling.
Integrated Vaporization Equipment
A 300 Nm³/h temperature-rise vaporizer and a 150 Nm³/h EAG vaporizer are incorporated into the system to support associated vaporization and gas-handling processes.
PLC and VFD Automated Control
The integrated PLC and VFD control system manages pump operation and supports variable-speed adjustment according to operating requirements. An HMI interface allows operators to monitor and control equipment operation.
Available functions include flow, pressure, temperature and liquid-level monitoring, fault diagnosis and operating data recording. Modbus and 4G communication options are available for projects requiring remote connectivity.
Applications
The LNG Truck Fueling Station is suitable for:
Logistics Hubs and Fleet Depots: Dedicated LNG refueling facilities for heavy-duty trucks and commercial transportation fleets.
Freight Corridors: Commercial LNG refueling stations serving long-distance truck transportation routes.
Commercial LNG Stations: Public and private refueling facilities supplying regional heavy-duty vehicle traffic.
Industrial Transport Sites: LNG fueling facilities supporting transportation operations at industrial and logistics locations.
Configuration Options
The station offers several equipment and control options to accommodate different project requirements.
• Cryogenic Pump Brands: American ACD, French Cryostar and qualified domestic brands.
• Pump Configurations: TYL-2×15 and TYL-2×22 dual-pump models.
• Control and Communication: PLC and VFD control, with optional Modbus and 4G communication.
• Equipment Arrangement: Integrated outdoor skid-mounted configuration with supporting vaporization equipment.
Project configuration is determined by the required dispensing capacity, LNG storage arrangement, operating pressure, electrical supply, site conditions and system connection requirements.
LNG storage tanks and other upstream or site infrastructure can be incorporated into the project supply scope or specified separately, depending on the agreed equipment package.
Manufacturing, Quality Control and Technical Support
Our manufacturing capabilities include CNC processing facilities, an R&D team and industrial equipment production facilities. Manufacturing activities are supported by an ISO 9001-certified quality management system.
For LNG truck fueling projects, we provide equipment configuration support, technical documentation, commissioning assistance and operator training. Remote technical assistance, fault diagnosis and maintenance support are also available.
Published service terms include a 12-month warranty and long-term maintenance support. Specific warranty coverage and overseas service arrangements are defined according to the project agreement.
Hot Tags: LNG truck fueling station, China LNG truck fueling station manufacturers, factory, L CNG Filling Skid, LNG Dispenser Skid, LNG Filling Station, LNG Refuelling Station, LNG Single pump Skid, lng stations

