L-CNG Filling Skid

L-CNG Filling Skid

The L-CNG Filling Skid is a skid-mounted LNG-to-CNG conversion unit designed for vehicle refueling projects using liquefied natural gas as the feedstock. It integrates LNG pressurization, high-pressure vaporization and CNG distribution control into a factory-assembled system. The equipment is suitable for CNG station investors, EPC contractors, gas distributors, bus depots and commercial fleet operators developing LNG-based CNG supply facilities.
Send Inquiry
Description

The L-CNG Filling Skid is a skid-mounted LNG-to-CNG conversion unit designed for vehicle refueling projects using liquefied natural gas as the feedstock. It integrates LNG pressurization, high-pressure vaporization and CNG distribution control into a factory-assembled system. The equipment is suitable for CNG station investors, EPC contractors, gas distributors, bus depots and commercial fleet operators developing LNG-based CNG supply facilities.

 

Technical Specifications

 

Parameter

TYL-CNG-1

TYL-CNG-2

Pump Configuration

Single plunger pump

Dual plunger pumps

Pump Flow Rate (L/h)

1,000 / 1,500 / 2,500

1,000 × 2 / 1,500 × 2 / 2,500 × 2

Vaporizer Capacity (Nm³/h)

1,000 / 1,500 / 2,500

1,000 × 2 / 1,500 × 2 / 2,500 × 2

Motor Power (kW)

15 / 22 / 37

30 / 44 / 74

Dimensions (mm)

3,200 × 2,200 × 2,200

3,600 × 2,200 × 2,200

 

General Operating and Control Parameters

Parameter

Specification

Control System

PLC + 7-inch touch screen + soft starter

Power Supply

380V/50Hz standard; 480V/60Hz optional

Ambient Temperature

-30°C to +50°C

Communication Interfaces

RS485 / Ethernet

LNG Unloading Connection

DN50 flange or quick coupling

Installation

Outdoor skid-mounted design

 

Key Features

 

Integrated LNG Pressurization and Vaporization
The plunger pump pressurizes LNG before it enters the high-pressure vaporizer for conversion into compressed natural gas. A booster vaporizer and water bath heater support the heating process and help prevent ice blockage during operation.
The high-pressure vaporizer, sequence control panel and water bath heater are arranged on the same skid and pre-assembled at the factory, reducing on-site equipment installation and connection work.


PLC Control and Operating Protection
The integrated PLC system manages pump operation, pressure and temperature monitoring, and sequence control panel switching. A 7-inch touch screen displays operating parameters and equipment status.
The control and protection functions include:
• LNG level, pump discharge pressure and post-vaporizer temperature monitoring.
• Sequence control panel status monitoring.
• Combustible gas leakage alarms and interlocks.
• Automatic pump shutdown under overpressure conditions.
• Low-temperature protection and emergency stop.
• RS485 and Ethernet interfaces for remote monitoring and data transmission.
A soft starter helps reduce electrical and mechanical impact during pump startup.


Outdoor Skid-Mounted Design
The compact skid structure is designed for outdoor installation without requiring a dedicated equipment building. Its operating temperature range is -30°C to +50°C.
The integrated equipment arrangement combines the main pressurization and vaporization components with auxiliary heating and CNG distribution control, simplifying the overall station layout.

 

Typical Applications

01/

CNG filling stations: LNG-based CNG production and supply for vehicle refueling.

02/

LNG/CNG co-located stations: Additional CNG refueling capacity alongside existing LNG facilities.

03/

Bus depots: CNG supply for public transportation and fleet refueling.

04/

Logistics parks and heavy-truck parking areas: Natural gas supply for commercial vehicle fleets.

05/

Oilfields and mining projects: Skid-mounted LNG-to-CNG conversion for suitable remote or temporary gas supply facilities.

 

Pump Configurations and Project Options

 

The TYL-CNG series offers two pump configurations to accommodate different station capacities and operating requirements.


TYL-CNG-1 – Single-Pump Configuration
Equipped with one plunger pump, TYL-CNG-1 provides a compact solution for stations with relatively moderate gas demand. Its single-pump arrangement is suitable for projects that do not require a second pump for standby operation.


TYL-CNG-2 – Dual-Pump Configuration
Equipped with two plunger pumps, TYL-CNG-2 provides greater flexibility in pump operation. The two-pump arrangement can be configured for duty/standby operation or parallel operation according to the project design and operating requirements.
 

Available Configuration Options
• Pump flow rate: 1,000 / 1,500 / 2,500 L/h per pump.
• Vaporizer material: 6063 aluminum alloy standard; 316L stainless steel optional.
• Heating method: Electric water bath heating standard; steam or hot water heating optional.
• Power supply: 380V/50Hz standard; 480V/60Hz optional.
• Pump arrangement: TYL-CNG-1 single pump or TYL-CNG-2 dual pumps.
• CNG storage connection: Reserved connections on the sequence control panel for an external CNG storage cylinder bank.
• LNG unloading connection: DN50 flange or quick coupling.
These options allow the equipment arrangement to be adapted to available heating resources, site power supply, required gas capacity and connections with external station equipment.

 

Engineering Support and After-Sales Service

 

Qingdao Lenado Intelligent Equipment Co., Ltd. provides technical consultation, equipment selection and configuration support for L-CNG station projects. Engineering services include pressure and structural requirement assessment, site surveys and project feasibility analysis.
The company has an R&D team, CNC production and processing equipment, and dedicated assembly facilities for equipment manufacturing and system integration. Its corporate credentials include ISO 9001 certification, special equipment manufacturing qualifications and product explosion-proof qualifications.
For equipment operation, the PLC system includes an automatic pump pre-cooling program. Pre-cooling is generally required before the first startup or after extended idle periods.
Routine maintenance recommendations include:
• Plunger pump seal inspection every 2,000 operating hours.
• High-pressure vaporizer fin cleaning once a year.
• PLC cabinet maintenance once a year.
After-sales support includes a 12-month warranty, lifelong maintenance support, on-site commissioning, operator training, remote technical assistance, fault early-warning support and spare parts assistance.

Hot Tags: l-CNG filling skid, China l-CNG filling skid manufacturers, factory, LNG Dispenser Skid, lng stations, LNG Truck Fueling Station, LNG Vaporization And Pressure Reduction Skid, Mobile LNG Fueling Station, Skid mounted LNG Vehicle Refueling Station

Send Inquiry
Send Inquiry