Skid-mounted LNG Vehicle Refueling Station

Skid-mounted LNG Vehicle Refueling Station

The Skid-mounted LNG Vehicle Refueling Station is an integrated equipment solution for LNG vehicle refueling projects. It combines LNG unloading, storage tank pressurization, cryogenic transfer and vehicle dispensing processes within a skid-mounted layout. With integrated process equipment and two unloading options, the system provides a consolidated configuration for LNG station investors, operators and EPC contractors seeking to simplify equipment installation and adapt the fueling process to project requirements.
Send Inquiry
Description

The Skid-mounted LNG Vehicle Refueling Station is an integrated equipment solution for LNG vehicle refueling projects. It combines LNG unloading, storage tank pressurization, cryogenic transfer and vehicle dispensing processes within a skid-mounted layout. With integrated process equipment and two unloading options, the system provides a consolidated configuration for LNG station investors, operators and EPC contractors seeking to simplify equipment installation and adapt the fueling process to project requirements.

 

Technical Specifications

 

Parameter

Specification

Model

TY-LNG

Storage Capacity

60 m³

Daily Refueling Capacity

10,000–150,000 kg

Energy Consumption

≤0.05 kW/kg

Unloading Time

≤2 hours

LNG Utilization Rate in Storage Tank

≥92%

Installation Type

Skid-mounted

Overall Dimensions (L × W × H)

4.2 × 2.3 × 2.5 m

Total Power

22 kW

 

Configurations and Equipment Supply

 

The TY-LNG station integrates the main process equipment for LNG unloading, storage tank pressurization and vehicle refueling. Its main configuration includes:
• LNG filling unit
• Cryogenic pump
• Unloading booster
• Tank booster
• Process pipelines and control valves
The system supports two LNG unloading methods:


Self-Pressurized Unloading
A vaporizer-based pressure-building process creates the pressure difference needed to transfer LNG from the tanker into the station storage tank. This method uses the tanker's pressure-building process rather than a cryogenic unloading pump to drive LNG transfer.


Pump-Assisted Unloading
A cryogenic pump provides the transfer pressure required to move LNG from the tanker into the station storage tank, supporting pump-driven unloading operations.
The unloading arrangement can be selected according to project requirements and the specified equipment configuration. After unloading, the system supports storage tank pressurization, temperature regulation and LNG vehicle refueling through its integrated process layout.

 

Key Technical Features

Vacuum-Insulated Process Piping

Main cryogenic process pipelines use vacuum-insulated piping, with vacuum flanges at key connections. This design reduces external heat ingress during LNG transfer, helping maintain low-temperature conditions and limit unwanted vaporization within the piping system.

PLC-Based Automatic Control

The PLC control system coordinates operating functions and pneumatic shut-off valves during LNG unloading, storage tank pressurization and vehicle refueling. Centralized control simplifies process operation, reduces frequent manual valve handling and helps operators manage the main station functions.

Integrated Skid-Mounted Design

The main process equipment, pipelines and control valves are arranged on a common skid. This factory-integrated layout reduces the amount of on-site equipment assembly and pipeline coordination, helping simplify installation planning and project implementation.

 

Project Engineering and Configuration Support

 

Qingdao Lenado provides engineering and configuration support to adapt LNG refueling equipment to different project requirements and site conditions.
Project support includes:
• LNG storage capacity selection and equipment configuration
• Selection of suitable LNG unloading arrangements
• Equipment layout and site adaptation
• Process and structural configuration design
• Production tracking and technical coordination
• Transportation documentation and export support
These services support equipment selection, site preparation and technical coordination for LNG station investors and EPC contractors.

 

Manufacturing Qualifications and After-Sales Support

 

Qingdao Lenado specializes in the R&D, manufacturing and supply of natural gas and LNG equipment. Its manufacturing capabilities include CNC production and processing equipment, supported by a professional R&D team and a quality management system.
The company holds ISO 9001 certification, a special equipment manufacturing license and product explosion-proof qualifications. Its technical portfolio also includes 21 product patents and more than 80 technologies with independent intellectual property rights.
After-sales support includes:
• 12-month product warranty and lifetime maintenance support
• On-site commissioning and operator training
• Remote technical assistance and fault diagnosis
• Spare parts supply
• 24-hour online customer service

Hot Tags: skid-mounted LNG vehicle refueling station, China skid-mounted LNG vehicle refueling station manufacturers, factory, LNG Bunkering Station, LNG Single pump Skid, LNG Truck Fueling Station, LNG Vaporization And Pressure Reduction Skid, Mobile LNG Fueling Station, Skid mounted LNG Vehicle Refueling Station

Send Inquiry
Send Inquiry