LNG Bunkering Station

LNG Bunkering Station

The LNG Bunkering Station is a land-based LNG storage and supply facility designed to receive LNG from tanker trucks, store it under cryogenic conditions and deliver it to LNG-powered vehicles or compatible receiving systems. It integrates LNG unloading, cryogenic storage, pumping, pressure management and dispensing into a coordinated supply facility. The system is suitable for LNG station investors, fuel distributors, port operators, fleet operators and EPC contractors developing land-based LNG supply projects.
Send Inquiry
Description

The LNG Bunkering Station is a land-based LNG storage and supply facility designed to receive LNG from tanker trucks, store it under cryogenic conditions and deliver it to LNG-powered vehicles or compatible receiving systems. It integrates LNG unloading, cryogenic storage, pumping, pressure management and dispensing into a coordinated supply facility. The system is suitable for LNG station investors, fuel distributors, port operators, fleet operators and EPC contractors developing land-based LNG supply projects.

 

Technical Specifications

 

The station configuration is selected according to fuel demand, storage requirements, unloading conditions and the receiving equipment.

 

Parameter

Project Design Considerations

Working Medium

Liquefied Natural Gas (LNG)

LNG Supply Source

LNG tanker trucks or container tank trucks

Storage Method

Cryogenic LNG storage tank

Storage Capacity

Based on daily demand and tanker replenishment frequency

Pump Configuration

Selected according to transfer and dispensing demand

Operating Pressure

Matched to the receiving equipment

Dispensing System

Selected according to the number and type of receiving points

Unloading Method

Tanker self-pressurization, pump unloading or combined arrangement

 

Actual storage capacity, pump flow rate, operating pressure and dispensing capacity depend on the selected equipment and project design.

 

Main Equipment Configuration

 

A typical LNG bunkering station consists of the following equipment and functional units:

01/

LNG Storage Tank: Stores LNG under cryogenic conditions and supplies the downstream pumping system.

02/

LNG Submersible Pump: Transfers LNG from the storage tank and raises its pressure for delivery to the dispensing system.

03/

LNG Dispenser: Delivers LNG to compatible vehicles or receiving equipment.

04/

Unloading Booster Vaporizer: Provides the pressure-building function required by the selected tanker unloading method.

05/

Tank Pressurization Vaporizer: Vaporizes a portion of LNG and returns the gas to the storage tank to support tank pressure management.

06/

EAG Heater and Temperature-Raising Vaporizer: Support gas heating and temperature regulation according to the selected process.

07/

Control and Safety Systems: Monitor operating conditions and coordinate equipment operation and safety-related functions.

 

Operating Process

 

LNG Unloading
LNG is delivered by tanker truck or container tank truck and transferred into the station's cryogenic storage tank. Depending on the unloading arrangement, a booster vaporizer or cryogenic pump provides the required transfer pressure.


LNG Storage and Pressure Management
LNG is stored in insulated cryogenic tanks. A tank pressurization vaporizer can convert a portion of the liquid into gas and return it to the tank to maintain the required operating pressure.


LNG Pumping and Dispensing
The submersible cryogenic pump draws LNG from the storage tank and delivers it under pressure to the dispenser or compatible receiving equipment.


Temperature and Gas Handling
The selected vaporizer and heater arrangement supports temperature regulation and associated gas-handling requirements during station operation.
The unloading, pressurization and temperature-regulation functions may use separate equipment. Their arrangement depends on the station process design.

 

Applications

 

The LNG Bunkering Station can serve:
• Heavy-Duty Truck Refueling: LNG supply for long-distance transportation and logistics fleets.
• LNG Bus Depots: Dedicated fueling facilities for public and intercity transportation.
• Port-Based LNG Supply: Land-based LNG storage and supply facilities serving LNG-powered vessels through compatible receiving and transfer connections.
• Commercial LNG Stations: Fixed LNG supply facilities operated by fuel distributors and station investors.
• Dedicated Fleet Facilities: LNG supply installations for transportation and industrial fleet operators.
For marine projects, vessel-side connections and LNG transfer equipment must be included in the engineering design. This land-based station configuration does not by itself represent a ship-to-ship or offshore bunkering system.

 

Project Customization

 

Lenado provides technical consultation, preliminary site assessment, feasibility analysis and equipment selection support for LNG bunkering projects.
Configuration planning can cover:
• LNG storage capacity and tanker replenishment frequency
• Cryogenic pump capacity and operating pressure
• Tanker unloading method and connection arrangement
• Vaporizer and tank pressure-management configuration
• Number and type of dispensing points
• Site layout, environmental conditions and safety requirements
The storage tank, cryogenic pump, vaporizer arrangement, dispensing equipment and control system can be coordinated according to the project's process requirements. For port-related projects, the receiving interface and required LNG transfer arrangement can also be considered.

 

Quality & Project Support

 

Qingdao Lenado holds ISO 9001 system certification, a special equipment manufacturing license and product explosion-proof qualifications. Its technical and manufacturing resources include an R&D team and CNC processing equipment.
For LNG station projects, equipment selection and quality requirements cover cryogenic components, pressure-related equipment, electrical and instrumentation systems, and explosion-proof provisions where applicable. Relevant inspection and documentation requirements are addressed according to the project specification.
Project support includes equipment configuration assistance, technical documentation, packaging and transportation coordination, installation and commissioning support, operator training and technical assistance. Supplied equipment is covered by a 12-month warranty, with lifelong maintenance support available according to the project agreement.

Hot Tags: LNG bunkering station, China LNG bunkering station manufacturers, factory, L CNG Filling Skid, LNG Dispenser Skid, LNG Filling Station, LNG Refuelling Station, LNG Truck Fueling Station, Mobile LNG Fueling Station

Send Inquiry
Send Inquiry