The LNG Single-pump Skid is a pre-assembled LNG vehicle refueling unit designed for fueling stations, industrial sites and remote locations. It integrates the main LNG dispensing equipment on a common steel base, providing a compact solution for station investors, EPC contractors, gas station operators and equipment integrators developing new LNG fueling facilities or expanding existing stations. Its skid-mounted structure reduces on-site assembly work and simplifies equipment transportation and deployment.
Technical Specifications
The LNG Single-pump Skid is available in three models, each with a rated dispensing capacity of 20 T/D and a maximum flow rate of 340 L/min. The primary difference between the models is the LNG pump motor power.
|
Technical Parameter |
TYL-D-A-1×11 |
TYL-D-C-1×15 |
TYL-D-X-1×11 |
|
Rated Dispensing Capacity |
20 T/D |
20 T/D |
20 T/D |
|
Maximum Flow Rate |
340 L/min |
340 L/min |
340 L/min |
|
LNG Pump Power |
11 kW |
15 kW |
11 kW |
|
Temperature-rise Vaporizer |
300 Nm³/h |
300 Nm³/h |
300 Nm³/h |
|
EAG Vaporizer |
150 Nm³/h |
150 Nm³/h |
150 Nm³/h |
Product Features
Integrated Skid-mounted Structure
The LNG cryogenic pump, dispenser, vacuum-insulated piping, valves, instruments, electrical control cabinet and vaporization equipment are integrated on a common steel base. The compact structure provides a defined installation footprint of 3,200 × 2,300 × 2,500 mm (L × W × H), facilitating transportation and station layout planning.
Cryogenic Materials and Insulation
Designed for LNG handling at temperatures of approximately -162°C, the skid uses cryogenic-grade stainless steel or equivalent materials for wetted components. Vacuum-insulated piping helps reduce heat input during LNG transfer and supports stable low-temperature operation.
PLC and VFD Control
The PLC-based control system provides centralized equipment monitoring and operational control. Variable frequency drive (VFD) technology allows adjustment of cryogenic pump speed to accommodate different operating requirements.
Safety Protection
The system incorporates emergency shutdown (ESD), safety interlocks, overpressure protection, leakage detection and grounding provisions. These features support safe LNG transfer and equipment operation.
Integrated Vaporization Configuration
The skid includes a 300 Nm³/h temperature-rise vaporizer and a 150 Nm³/h EAG vaporizer. Both vaporizer ratings remain consistent across the three single-pump models.
Model Selection: Single-pump vs. Dual-pump
Lenado also offers a dual-pump LNG skid for projects requiring higher dispensing capacity.
|
Configuration |
Rated Dispensing Capacity |
Maximum Flow Rate |
Pump Power |
|
Single-pump |
20 T/D |
340 L/min |
1×11 kW or 1×15 kW |
|
Dual-pump |
40 T/D |
680 L/min |
2×11 kW or 2×15 kW |
The main difference is the number of pumps and the corresponding rated dispensing capacity.
• Single-pump configuration: Suitable for LNG stations with a rated dispensing capacity of 20 T/D.
• Dual-pump configuration: Provides a rated dispensing capacity of 40 T/D for projects with higher daily LNG dispensing requirements.
For model selection, buyers should consider projected daily LNG demand, vehicle refueling schedules and planned station capacity. The three single-pump models share the same published dispensing and vaporizer ratings, with pump motor power as their primary listed difference.
Manufacturing, Quality Assurance & Project Support
Qingdao Lenado Intelligent Equipment Co., Ltd. specializes in the R&D, design and manufacturing of natural gas equipment, including LNG refueling skids and CNG compressor systems. Its manufacturing resources include CNC production and processing equipment, professional technical personnel and production teams.
Manufacturing and Quality Credentials
• ISO 9001 quality management system certification
• Special equipment manufacturing license
• Product explosion-proof qualifications
• CNC production and processing facilities
Project Support
Technical consultation and equipment model selection
• Customized equipment design according to project-specific structural and configuration requirements
• On-site commissioning and operator training
• Remote technical assistance and fault diagnosis
• 12-month product warranty
• Lifelong maintenance support and spare parts supply
Equipment Scope & Installation Requirements
The LNG Single-pump Skid integrates the main refueling equipment into one skid-mounted unit.
Main Equipment Included
• LNG cryogenic pump
• LNG dispenser and fueling equipment
• Vacuum-insulated piping
• Cryogenic valves and instruments
• Electrical control cabinet
• Temperature-rise vaporizer
• EAG vaporizer
Reference Overall Dimensions: 3,200 × 2,300 × 2,500 mm (L × W × H).
External Project Facilities
The LNG storage tank, tanker unloading facilities, civil foundation, external connecting pipelines and site utilities are separate project interfaces. These facilities need to be incorporated into the overall station design and coordinated with the skid installation layout.
This equipment scope helps EPC contractors and station investors distinguish the supplied skid package from the external facilities required for a complete LNG refueling station.
Hot Tags: LNG single-pump skid, China LNG single-pump skid manufacturers, factory, L CNG Filling Skid, LNG Bunkering Station, LNG Compressor Station, LNG Dispenser Skid, LNG Filling Station, LNG Vaporization And Pressure Reduction Skid